Case Studies

Flood Risk Assessment KSN

TEAM

Environmental Management Team

Sector

Related Services

Natural Hazard Risk Assessment; Flood/Climate Risk Assessment

People To Contact

Overview of service

KSN Horizon instructed ORS to carry out Flood/Climate Risk and Natural Hazards Risk Assessments on a number of high-value properties in Dublin city centre. A report was created to comply with the section ‘RSL01 Flood/Climate Risk Assessment criteria’ in the BREEAM Resilience Scope.

This report aimed to assess the development area’s natural hazards. The key studies used in preparing this report include hydrological studies and natural hazards risk assessment. This document was created to comply with the section ‘RSL03 Natural Hazard Assessment Criteria’ in the BREEAM Resilience Scope.

An extreme natural event (of the average environmental, meteorological, hydrological or other natural conditions) that is statistically rare at a particular place and time.

Screenshot 2023 02 13 at 10.25.00
Farran Mullingar
Screenshot 2023 02 13 at 10.25.00

The assessment is set out in three stages:/

  1. Risk Identification and Screening; 
  2. Risk Classification; and 
  3. Risk Evaluation

The first stage of the assessment was to identify potential unplanned risks that the development may be vulnerable. An initial list of natural hazards was identified, and the list of potential natural hazards was subjected to a screening assessment to distinguish the potential risks that meet the scoping criteria.

Natural hazards were then evaluated concerning the likelihood of occurrence and the potential impact. The rating criteria adopted for the assessment used in A Guide to Risk Assessment in Major Emergency Management (DoEHLG,2010).

The resulting risk classifications were incorporated into the Risk Matrix with the recommended actions required from an emergency response perspective.

Group 4987

Castleforbes 3
Screenshot 2023 02 13 at 10.25.00

Project challenges

Managing through Covid

The ongoing pandemic impacted the completion of these reports. This was a risk that previously would have been considered as an event with a low likelihood of occurring. As a pandemic has a global impact, recommendations included staff and residents following Strategic Emergency Management (SEM) and National Structures and Framework introduced by the government. Extra signage, facilities, and cleaning services were introduced throughout the site as necessary.

Leads

Key Contacts

  • John Brennan Managing Director
    Group 8501 2
    View Bio
    John Brennan

    Managing Director

  • Luke Martin
    Group 8501 2
    View Bio
    Luke Martin

    Associate and Joint Environmental Lead

  • Alan Kiernan Joint Environmental Lead
    Group 8501 2
    View Bio
    Alan Kiernan

    Associate and Joint Environmental Lead

  • PICTURE 1
    N5 Westport to Turlough Road

    Environmental

  • Aerial CGI 2
    Biogas – Renewable Energy Technology Tailored for the Agri Sector

    Environmental

  • DJI 0037
    Fire-Water Risk Assessment & Testing

    Environmental

  • Alan Cormac Lidl Lifestyle 2
    Flood Risk Assessment KSN

    Environmental

  • Lifestyle Drawing
    Fire Risk Assessment Panda

    Environmental

  • DJI 0040 1 2
    Flood Risk Assessment

    Environmental

  • Pharmaceutical 1
    Compliance for the Pharma Industry

    Environmental

Talk to A specialist

Great projects start with great relationships. Have a project in mind? Contact us.

Contact us

Block A, Marlinstown
Business Park, Mullingar,
Co.Westmeath, Ireland.
N91 W5NN

Pembr, 127 Baggot Street Lower, Baggotrath Dublin, D02 F634

Portershed,
Eyre Square,
Galway,
H91 HY51

Office 4, Spencer House,
High Road, Letterkenny,
Co. Donegal,
Ireland. F92 PX8N

Republic of Work,
12 S Mall,
Centre, Cork,
T12 RD43

ORS has satellite offices in Newry and Maynooth.

Back to Top