ORS acted as Assigned Certifiers on the refurbishment and extension of the existing Morgan Hotel. The extension added an additional 38 bedrooms to the hotel. The development consists of a new link corridor from first to fifth floor levels between the existing front and rear blocks of the hotel with a new sedum green roof. The extension included of a new fifth floor (with structural steel frame) along with alterations and refurbishment of existing hotel rooms (including the addition tied back into existing the framework and a façade treatment form part of the works) There is also an additional lift core to one of the blocks and the provision of a plant area at roof level.