Schedules of Condition

ORS is engaged by TII to carry out preliminary building and structure surveys at selected locations along the preferred MetroLink alignment corridor. The outputs of these surveys will be used to inform the preliminary design and the settlement and vibration analysis for the MetroLink project. Approximately €3 billion of construction works and services will be needed to deliver the overall MetroLink scheme, including tunnels, stations, other structures, railway systems, rolling stock design and professional support.